Surplus topsoil — Riverside Quarter
Phase 1 earthworks strip generates 3,800 m³ of tested topsoil that must leave site between August and the end of October. The engine considered 7 pathways; 5 remain open.
- Quantity
- 3,800 m³ (~5,300 t)
- Window
- Aug 2026 – Oct 2026
- Location
- Bedminster, Bristol · BS3 4NA
7 pathways considered · 5 open · best saves £144,815 vs landfill disposal